01
An automated storage module for temporary buffering of components was developed and implemented. The objective was to optimize the material flow within the production line and effectively prevent process interruptions.
02
The project included the design, control system development, and the assembly and installation of the complete system. The solution features a modular design and can be flexibly adapted to changing production requirements.
Key components such as conveyor systems, lift systems and an adjustable output sequence enable a continuous and automated material flow that is both cycle-time-optimized and reliable.
The system could be seamlessly integrated into existing production environments.
Silvio Winkler
Project Manager Conveyor Technology
Phone: +49 35723 93 33 12
Email: sales@groetschelgruppe.de
Michael Richter
Project Manager Climbing Technology
Phone: +49 35723 93 33 12
E-mail: sales@groetschelgruppe.de
René Lorenz
Project Manager Custom Machine Building
Phone: +49 35723 93 33 12
Email: sales@groetschelgruppe.de
03